Sinclair Community College

Topics > Students > 4th and 5th Street Construction

4th and 5th Street Construction (10 FAQs)

Top 10 FAQs For This Topic
Is the construction related to the boil advisory and water main break?
Will parking for the Conference Center be affected?
Will my parking lot be open during construction?
Will the RTA bus stops still be available on 4th and 5th Streets?
What is Sinclair’s plan to redevelop 4th and 5th Streets?
I have a question about construction, who can I talk to?
During construction will the water be safe to drink?
I have an appointment at the Health Sciences Center dental clinic. Where can I park during construction?
How long will the construction last?
How can I avoid the construction?

Recently Added FAQs To This Topic
Is the construction related to the boil advisory and water main break?
What is Sinclair’s plan to redevelop 4th and 5th Streets?
I have an appointment at the Health Sciences Center dental clinic. Where can I park during construction?
How can I avoid the construction?
I have a question about construction, who can I talk to?
Will parking for the Conference Center be affected?
Will my parking lot be open during construction?
Will the RTA bus stops still be available on 4th and 5th Streets?
During construction will the water be safe to drink?
How long will the construction last?
Search within this topic :

Back to Top